Energy Consumption Optimization of a Tire Production Plant

Industry: Tire Industry

Power in Numbers

Project Gallery

Energy Consumption Optimization of a Tire Production Plant

Industry: Tire Industry

Challenge

In this project, a tire production plant was studied and by using the most modern Pinch Technology and improving heat exchangers network, 30% energy saving in company was realized.

    1. Production of at least 4.5MW electric power to meet plant's power demand.
    2. Production of at least 5T/h steam (30 bar) by simultaneous production system.
    3. Production of at least 4.5T/h steam (22 bar) by simultaneous production system.
    4. Production of at least 4T/h steam (10 bar) by simultaneous production system.

Proposed Solution

Results

Energy Saving

(%)

OPEX Saving

($/yr)

Investment

($)

Payback Period (month)

30

49,740

25,833

6

LOGO.png

Info@altaprocess.ca

​

Altius Centre - Suite 2500

500 - 4th Ave SW, Calgary, Alberta T2P 2V6 Canada

Subscribe Form

Thanks for submitting!

Follow Us On:

© Copyright Alta Process Solutions.

All Rights Reserved.

bottom of page