Energy Consumption Optimization of a Tire Production Plant
Industry: Tire Industry
Challenge
In this project, a tire production plant was studied and by using the most modern Pinch Technology and improving heat exchangers network, 30% energy saving in company was realized.
- 1. Production of at least 4.5MW electric power to meet plant's power demand.
2. Production of at least 5T/h steam (30 bar) by simultaneous production system.
3. Production of at least 4.5T/h steam (22 bar) by simultaneous production system.
4. Production of at least 4T/h steam (10 bar) by simultaneous production system.
Proposed Solution
Results
Energy Saving
(%)
OPEX Saving
($/yr)
Investment
($)
Payback Period (month)
30
49,740
25,833
6