Retrofitting of HEN Using Combined Pinch & Exergy Analysis

Industry: Steam Power Plant

Power in Numbers

Project Gallery

Retrofitting of HEN Using Combined Pinch & Exergy Analysis

Industry: Steam Power Plant

Challenge

This project consists of retrofitting of heat exchangers network (HENs) in a steam plant. By using the most advanced Combined Pinch and Exergy Analysis, 150,000 ($/yr) energy saving was realized.

    1. Reduction in Boilers Load: 11.529 MW
    2. Reduction in Fuel consumption: 1,039.52 Nm3/h
    3. Reduction in Condenser Load: 18.791MW
    4. Increase in Cycle efficiency: 0.85 %
    5. Condenser Conservation Profits: 38,266 $/yr
    6. Fuel Consumption Conservation Profits according to the first scenario: 151,750 $/yr
    7. Fuel Consumption Conservation Profits according to the second scenario: 30,356 $/yr
    8. Total Energy Conservation Profits according to the first scenario: 190,016 $/yr
    9. Total Energy Conservation Profits according to the second scenario: 68,621 $/yr
    10. Additional Area: 511.6 m2
    11. Area Efficiency: 79.72 %
    12. Investment: 145,886 $
    13. Payback Period according to the first scenario: 8 months
    14. Payback Period according to the second scenario: 25 months

Proposed Solution

Results

Energy Saving

(%)

OPEX Saving

($/yr)

Investment

($)

Payback Period (month)

16

190,016

145,886

9